Quick status check: I had a dentist appointment scheduled for today, but it’s been pushed back until November 11th since my dentist is sick and booked solid until then. That means I’m still powering through some dental pain, which slows things down a bit — but not enough to stop progress.
Despite the setbacks, I’m continuing to develop the drone control system and map out the demo level layout. The drone is shaping up to be the player’s lifeline to each disposable Employee, so getting its feel and control right is a big priority. Meanwhile, the demo warehouse is slowly starting to look like the kind of cheerful corporate training facility that doubles as a death trap.
Thanks for bearing with me while real life slows things down a little. Progress may be slower than I’d like, but the deliveries are still going out.
Status: Drone: IN PROGRESS. Demo layout: IN PROGRESS. Teeth: DELAYED UNTIL NOVEMBER.
No comments:
Post a Comment